Noah Trailer 2:
Monday, 27 April 2009
Saturday, 25 April 2009
Thursday, 23 April 2009
Sunday, 19 April 2009
Its been a very long while since ive updated this blog. Im afraid ive been very busy with all this film making and so fourth. Ive kept more upto date with logging my progress on my facebook, so i can link to that if more info is of interest.
Anyway to make up a little for lost time here is the trailer for my film. Im about halfway through shooting at this point. Enjoy :)
Anyway to make up a little for lost time here is the trailer for my film. Im about halfway through shooting at this point. Enjoy :)
Wednesday, 11 March 2009
Tuesday, 24 February 2009


Hallo, just an update on my work during the last week. Last monday (16th feb) I was in newport working on my molds and making some props for John's film (knopic jars). I stayed in newport till the wednesday working on molds with help from John and making a few odds and ends for him as well, but eventually I had to return to Bristol becasue I ran out of silicone (which i was using for making molds onf the head parts) and had a backup supply there. I cocked up the silicon moulding in bristol a bit as I diddnt shake the catalyst liquid before mixing it with the silicone, which ment it took several days to cure (some bits are still sticky now!) and I made a fair bit of mess, but its turned out okay now.. The weekend was quiet work wise as I was traveling around alot visiting a convention and seeing my grandmother. Today I've been finishing the last of the purs for my molds, making them all complete now (bar the facial mold). Once the 2 foot molds are set I'll take them to John Wright to help him build armatures to fit them, hopefuly I can do that this evening. Im heading to newport again tomorrow to see my dissertation tutor and I may hang around there for thursday as well to get advice from John on doing my resin casts and also so that I can speak to Larua Jons who has asked for some advice on using photoshop. During this week I also did a couple of sound tests, but they wernt that great, i need to get back into it. A few local mates of mine are gonna help me out with the sound now if all goes well.
Thursday, 12 February 2009
Monday, 9 February 2009
its been a while but ive been pretty busy, lately ive been making all my molds. They're not finished but ther well under way. Im gonna jot down a few key dates for when ive done things..
I finished the torso mold on the 1st of febuary after a few mishaps, and i took it to John Wright last thursday, he says the armature will take about 2 weeks from now. Last monday me and John started work on the 3 main support arms for the armature. i spent most of the last 2 weeks working on all my small molds, i now have all the boxes made for all molds except the feet and the hands, one kneww and one elbow are all bedded ready for the plaster. I got my laptop back from the repair guy on friday, so now i have a computer with working sound, so i can get back to work on the sound for the film.
My main concern right now is Noah's feet, they require the cunstruction of a 3 part mold and some fiddly armature work that could be costly. Im wondering wether to omit them somehow, either by avoiding shots showing them, turning them into visable stumps or replacing them with something, possibly mechanical prosthetics of some kind. Anyway ill draw up some ideas and try to work it out.
I have been taking pictures of the molding, and ill try and get them up soon, im just killing time at the minute.
I finished the torso mold on the 1st of febuary after a few mishaps, and i took it to John Wright last thursday, he says the armature will take about 2 weeks from now. Last monday me and John started work on the 3 main support arms for the armature. i spent most of the last 2 weeks working on all my small molds, i now have all the boxes made for all molds except the feet and the hands, one kneww and one elbow are all bedded ready for the plaster. I got my laptop back from the repair guy on friday, so now i have a computer with working sound, so i can get back to work on the sound for the film.
My main concern right now is Noah's feet, they require the cunstruction of a 3 part mold and some fiddly armature work that could be costly. Im wondering wether to omit them somehow, either by avoiding shots showing them, turning them into visable stumps or replacing them with something, possibly mechanical prosthetics of some kind. Anyway ill draw up some ideas and try to work it out.
I have been taking pictures of the molding, and ill try and get them up soon, im just killing time at the minute.
Wednesday, 7 January 2009
I just thought I'd do a quick update as its a month still the last one. At the moment I'm staying with my dad and working on the set, its getting there but predicably progress is slower than I'd like. I'll try and get pictures soon.
This is the new instrument for my soundcape, its the inside of a piano.

The sounds that you can get from it are really spooky and just the extra element my sondscape for the film will need.
Before I broke up for christmas I had to do another 5 minute presentation, this is the video I put together for it:
The video has some fragments from some of the sound tests I made using the piano.
This is the new instrument for my soundcape, its the inside of a piano.
The sounds that you can get from it are really spooky and just the extra element my sondscape for the film will need.
Before I broke up for christmas I had to do another 5 minute presentation, this is the video I put together for it:
The video has some fragments from some of the sound tests I made using the piano.
Subscribe to:
Posts (Atom)